Sewage component billing information for residents within Nobleton Sewer Connection project (Phase 2, contract 3)

Posted:
Category
General News
Public Works
Type(s)
News

Residents within Nobleton’s Sewer Connection project (Phase 2, contract 3) will now see an increase to their water billing to include the sewer component. Residents had up to one year to hook up to the new sewer connection. Regardless if you have connected or not, residents will now have a sewer charge included with their billing, similar to all Township properties with water and wastewater service.

The variable rate for water and wastewater is combined on the bill. The water portion is $2.00, and wastewater is $2.55 for a combined rate of $4.55 for Tier 1. The variable rate covers the operating costs of water and wastewater services from York Region and the Township.

The fixed rate for the water and wastewater is combined on the bill. The water portion is $69.74, and wastewater is $103.76 for a combined rate of $173.50.  The fixed rate covers the replacement and repair of infrastructure for both water and wastewater.

These fees are in accordance with the Townships Water and Wastewater By-Law.

King residents can use our online water portal to access daily water consumption, sign up to receive warnings of high consumption and track water history and usage. Visit king.ca/waterbilling and create an account. The page also includes information on how to look for leaks in your system which may contribute to higher-than-usual bills.