Revisions to Enviro Study Report

REVISIONS AND ADDENDA TO ENVIRONMENTAL STUDY REPORT

NOTICE OF FILING OF ADDENDUM

CLASS ENVIRONMENTAL ASSESSMENT, ENVIRONMENTAL STUDY REPORT

SEWAGE SERVICING FOR THE COMMUNITY OF NOBLETON

TOWNSHIP OF KING

 

Municipal Class Environmental Assessment for Nobleton Sanitary Sewer System was originally completed in July 2003. Construction of Nobleton Sanitary Sewer System was started in 2009 and significant progress has been made so far. The detailed design of the Contract 5 of Nobleton Sanitary Sewer Project is proceeding well and is entering into final stages.  The original preliminary design prepared for the project envisioned an easement from the east end of Hawman Avenue and a connection on Hwy 27. During detailed design the Township evaluated alternative sewer routing and determined that an easement through 6076 King Road and 47 Hawman Avenue, Nobleton, Ontario would be preferred.

An Addendum has now been completed to the Environmental Study Report which presents a revised preferred outfall for Contract 5.

Please note that only the changes proposed in the Addendum are open for review.

By this Notice the Addendum is being placed on the public record for review in accordance with the requirements of the Municipal Class Environmental Assessment. Subject to comments received as a result of this Notice, the Town intends to proceed with the construction of this project in the summer of 2013.

The Addendum is available for review at the following locations:

​Township of King

2075 King Road

King City, ON

L7B 1A1

Monday to Friday: 8:30am to 4:30pm

Telephone (905) 833-5321

Dr. William Laceby Community Centre and Arena 

15 Old King Road 

Nobleton, ON

L7B 1A1

Monday to Friday: 8:30am to 4:30pm 

Telephone (905) 833-5321

Please provide written comments to the Town Clerk within 30 calendar days from the date of this Notice. If concerns regarding this project cannot be resolved in discussion with the Town, a person may request that the Minister of the Environment make an order for the project to comply with the Environmental Assessment Act (referred to as a Part II Order), which addresses individual environmental assessment. Requests must be received by the Minister at the address below by June 29, 2013. A copy of the request must also be sent to the Town Clerk. If no request is received by June 29, 2013, construction of contract 5 Nobleton Sanitary Sewer System will proceed to design and construction as outlined in the Addendum to the Environmental Study Report.

Minister of the Environment

77 Wellesley Street West
11th Floor, Ferguson Block
Toronto ON
M7A 2T5

Comments and information regarding this Project are being collected in accordance with the requirements of the Environmental Assessment Act.  Personal information will be collected in accordance with Municipal Freedom of Information and Protection of 
Privacy Act (MFIPPA), all information received other than personal information may be included in the Project documentation which 
will become part of the public record.  Should you have any questions or concern with regard to the collection of personal information, please contact Wayne Pinkney C.E.T., Project Manager, Township of King at (905) 833-4575. 

This Notice issued May 30, 2013

 

Andrew Drzewiecki, Director of Engineering and Development
Township of King
2075 King Road
King City, Ontario, L7B 1A1

 

ADDENDUM DRAWINGS -   GP-1.pdf      PP-7.pdf